Zadní Chodov

Print
Zadní Chodov Area on the Map

Location: The Plzeň Region, Tachov area

Brief history

Mining took place from 1953 until 1993. There were five shafts and 167.4 km of horizontal mine tunnels. The total area of the mine is 7.2 km2. Mining was conducted to a depth of 1,200 m beneath the surface. Extracted was a total of 4,150.7 metric tons of uranium. The ore was processed at the chemical processing plant in Mydlovary.

Type of activity

Underground uranium mining – cut and fill stopping and gradual slicing of walls under an artificial ceiling.

Present-day conditions

Mine dismantled, the underground filled with water, the surface partly reclaimed. Waste sold and processed into crushed stone. Usable structures are prepared for sale or dismantling. Mine water treatment plant in operation with an aim to close it down as soon as the chemical structure of the water stabilizes.

The Environmental Problem and its Solution

Mine water

Outflow of contaminated mine water onto the terrain from the submerging of the mine. Regular pumping out of the water and water treatment; treated water released into the Hamer stream, and long-term monitoring.

Tailings Impoundments

None.