Brief history

This open pit splittable slate mining site was mined until 1950, and reopened from 1991 to 1992 after geologically prospecting the Hermína adit. Of the planned 840 m of tunneling, only 412.8 m with a cross section of 2.5 x 2.3 m were actually dug and work was stopped. 6,410 metric tons of tailings were extracted. The mine was dug to 28 m beneath the surface. Neither the mining district nor the protected deposit territory has been assessed.

Type of activity

Geological prospecting, the digging of tunnels using mining techniques.

Present-day conditions

  • The mine shaft has been secured in compliance with the mining regulations stipulated in 1992, and the entrance of the adit has been closed off with steel bars.
  • The underground parts of the mine have been cleaned out and the surface facilities have been dismantled with the exception of a pole mounted transformer station.

The Environmental Problem and its Solution

Mine Water

There is no mine water leakage to the surface due to strict geological and hydro-geological techniques used.

Tailings Impoundments

None.

Waste Dumps

Tailings pile removed - used as backfill for the Horní Benešov site rehabilitation.